Structural drying that finishes on a timeline, not when the instruments confirm it, leads to mold behind walls and the callbacks that follow. Our Pike drying crew completes the program when the readings say it's done — not before.
Structural Drying is a science-driven process built on thermodynamics, psychrometrics, and equipment calibration — not fans pointed at a wet floor and checked weekly. Here's what our Pike team brings to every structural drying project that ensures complete, documented results.
Undersized or generic dehumidification is the most common technical failure in Pike drying projects.
Every active drying project in Pike receives a daily psychrometric reading session: temperature, relative humidity, specific humidity, grains per pound of moisture in the air, and moisture content readings at fixed sensor points in each structural assembly. These readings are logged and provided as documentation of the drying program for your insurance claim. Drying is declared complete only when readings at all sensor points fall within the target EMC range for the material species being dried.
Wall cavity drying is where most post-loss mold in Pike properties originates. It's where we focus.
Insurance-formatted drying documentation means faster settlement and fewer adjuster callbacks.
Here are the specific drying scenarios and assembly types our Pike team is equipped and trained to handle.
Wall cavity drying in Pike is standard procedure on every job where moisture mapping indicates wall system saturation.
Subfloor assemblies — OSB or plywood sheathing over floor joists — and hardwood flooring systems require targeted drying approaches because of their density and their tendency to cup, buckle, or swell when dried too aggressively or left wet too long. Our Pike drying crew evaluates hardwood flooring species and moisture content before recommending drying-in-place versus removal, and when drying in place is appropriate, we use floor drying mats that direct conditioned air against the top face of the hardwood under controlled pressure — accelerating evaporation while minimizing the differential drying stress that causes cupping.
Crawlspace drying in Pike properties is complicated by limited access, typically poor natural ventilation, and the presence of vapor barriers that may trap moisture against wood framing. Our Pike below-grade drying team is equipped with compact high-velocity air movers that fit through standard crawlspace access hatches, portable LGR units configured for below-grade operation, and moisture meters suitable for sub-surface readings at joist and beam locations. Vapor barrier condition is evaluated and re-secured after drying if disturbed during the process.
Ceiling assembly drying is one of the more technically demanding aspects of water damage restoration in Pike structures.
Large-scale commercial drying in Pike is project-managed from day one with zone-specific reading logs.
Every active structural drying program in Pike is also a mold prevention program — because the conditions that support mold growth (elevated moisture content in organic materials and elevated relative humidity in the air space) are exactly the conditions a drying program is designed to eliminate. Our daily reading sessions include assessment of the ambient RH and temperature conditions in each drying zone against the threshold conditions that support mold colonization. If readings suggest an elevated mold risk — particularly in projects where extraction was delayed — we address it proactively with targeted antimicrobial treatment during the active drying program.


Before one piece of drying equipment is placed, our Pike team completes a full moisture mapping session using FLIR thermal imaging and calibrated pin-type and non-penetrating meters. The map documents all affected assemblies, saturation levels, and the extent of moisture migration through the structure. Equipment placement and sizing are calculated from this map.
Based on the moisture map, our Pike drying specialist designs an equipment layout: the number and type of LGR dehumidifiers required for the affected volume, the positioning and orientation of high-velocity air movers to create optimal airflow patterns across saturated assemblies, and the placement of cavity access ports for wall or ceiling injection drying.
Daily readings, daily reporting, daily equipment adjustment if needed — documented throughout.
When all sensor point readings fall within the target equilibrium moisture content range for the specific materials being dried, we perform a final comprehensive moisture survey of the entire affected area and issue a written drying completion report. This report is included in your insurance claim documentation and serves as your record of successful structural drying.



"The most important thing about COS Water Damage Restoration's Pike structural drying was that they explained the readings to me every single day. I understood what the numbers meant, what the target was, and how far we were from completion. By day six I was watching the moisture content readings in our wall framing drop from 28% to 11% and understood exactly what was happening and why. That level of transparency is what you need when your home is full of drying equipment for a week."
"The thermal imaging session at the beginning was what showed us the water had migrated into a wall cavity adjacent to the flooded room that we never would have found otherwise. COS Water Damage Restoration set up wall cavity drying for that section specifically, and the final readings confirmed it came out completely dry alongside everything else. That's the kind of detail that prevents the mold problem three months later."
"We manage several Pike commercial properties and structural drying after water events is something we deal with periodically. COS Water Damage Restoration is the only company we use because of their documentation process. Zone-specific readings, daily logs we can review from our office, and a written drying completion report at the end of every project. When a tenant asks for proof that remediation was complete, we have an instrument-confirmed document, not a technician's verbal assurance."
COS Water Damage Restoration's Pike structural drying team serves Pike and surrounding communities throughout NH. Daily monitoring included. Call +1-844-499-0972 to get started.
Don't let wet wall cavities become next month's mold problem. Call +1-844-499-0972 and get Pike's certified structural drying team on site.
📞 Call +1-844-499-0972 — Pike Structural Drying24/7 Available · IICRC WRT Certified · Daily Readings · Pike, NH